The PLI Scheme in India
A Production Linked Incentive (PLI) pays a manufacturer a share of what it actually produces or sells — not what it spends building the plant. The Union Government runs PLI as an umbrella across 14 sectors. Here is what that means in practice, how it differs from a capex subsidy, and the exact semiconductor PLI an Assam-built supplier can model today.
What is the PLI scheme?
PLI stands for Production Linked Incentive. It is a pay-for-output incentive: instead of handing a manufacturer money against its capital spend, the government pays a percentage of its incremental production or qualifying sales for a fixed number of years. The cash arrives only once the factory is running and shipping, so the incentive rewards manufacturing that actually happens rather than announcements.
"PLI scheme India" is usually shorthand for the national umbrella the Union Government runs across 14 sectors — from mobile phones and electronic components to pharmaceuticals, automobiles, solar modules and batteries — with a combined announced outlay of about Rs 1.9 lakh crore (PIB). Each sector has its own notification, eligibility bar and portal. Below we go deep on the one most relevant here: the semiconductor and electronics PLI, where every figure traces to the gazette.
The Semiconductor PLI, at a Glance
Headline numbers, summarised for scanning. The first three rows are read from our Semicon 2.0 scheme data; open the Policy Explorer for the full per-figure citations. The last row is national-umbrella context, attributed to PIB, not a figure we model.
| Term | What it means | Figure |
|---|---|---|
| Equipment & components PLI | The one true production-linked rate we model: paid on the value of your bill of materials sourced from domestic manufacturersOf domestic BoM value, tapering across five years | 10 / 8 / 6 / 4 / 2% |
| PLI duration & ceiling | How long the production incentive runs and the cap it works underFive years from FY 2028-29, capped at 50% of eligible capex | 5 yrs · cap 50% of capex |
| Entry bar (equipment makers) | Minimum investment and prior revenue to qualify for that rowPlus Rs 120 Cr prior revenue (including group companies) | Rs 300 Cr capex |
| National PLI umbrella | The broader scheme the term "PLI scheme India" usually means — context, not a figure we model~Rs 1.9 lakh crore announced outlay (PIB) · we model only the electronics/semiconductor pillars | 14 sectors |
Source: Semicon 2.0 guidelines, Pillar 2 (equipment, sub-assemblies and components), Para 3.4.3, table row (d), p.14-15. Figures mirror the fully-cited Machines & Materials entry in our Policy Explorer. National-umbrella figures: PIB ↗, Invest India ↗.
How a PLI Actually Pays Out
The money follows output
You claim a PLI only after you are producing. For the semiconductor equipment PLI, the incentive is a percentage of the value of components you source from domestic manufacturers — so the reward scales with how much you actually make and localise.
The rate usually tapers
The equipment PLI runs at 10%, then 8, 6, 4 and 2% across five years from FY 2028-29. Front-loaded support that steps down is deliberate: it rewards getting to volume early rather than coasting on the incentive.
There is a ceiling
The production incentive is capped at 50% of eligible capex. A PLI is powerful, but it is bounded by what you invested — which is why it is almost always modelled together with the capital-support grant, not instead of it.
Documentation is the real work
Every claim needs invoice-level evidence that components were sourced from Indian manufacturers, with supplier declarations. A part counts as domestic if it is made in India, even from imported raw material. The paperwork, not the rate, is where PLI claims are won or lost.
PLI, DLI or Capex Subsidy? They Are Not the Same
"PLI" gets used loosely for any manufacturing incentive. Three different mechanisms sit inside the semiconductor stack, and they pay on completely different triggers. Mixing them up is the most common modelling error we see.
| Mechanism | Pays on | Headline rate | Full detail |
|---|---|---|---|
| PLI — production-linked | Value of output / domestically sourced components, once producing | 10→2% of domestic BoM, 5 yrs | Citations → |
| DLI — deployment-linked | Net sales of a newly launched chip, IP core or SoC | 9% of net sales, 5 yrs | Citations → |
| Capex support (ECMS) | What you spend building the plant | 25% of eligible capex | Citations → |
Working out which of these your project can actually stack — and in what order — is exactly the kind of question we work on. Ask us which incentives fit your project →
Frequently Asked
- What is the PLI scheme in India?
- PLI stands for Production Linked Incentive. It is not a capital subsidy paid up front — it is a reward paid on output: the government pays an eligible manufacturer a percentage of its incremental production or qualifying sales for a fixed number of years, so the money arrives only once the factory actually makes and sells. The Union Government runs PLI as an umbrella across 14 sectors, from mobile phones and electronic components to pharmaceuticals, automobiles, solar modules and batteries, with a combined announced outlay of about Rs 1.9 lakh crore (per PIB).
- How is a PLI different from a capex subsidy?
- A capex subsidy pays you a share of what you spend building the plant — it lands around the investment. A PLI pays you a share of what you produce or sell, year after year, after the plant is running. Many of the strongest incentive stacks combine both: a capex grant to get built and a PLI to reward the output. The semiconductor schemes are a clear example — 30% capital support plus a tapering production-linked incentive on domestically sourced components.
- Is there a PLI for semiconductors and electronics?
- Yes. Under Semicon 2.0, the equipment, sub-assemblies and components row pays a production-linked incentive of 10% / 8% / 6% / 4% / 2% of the bill-of-materials value sourced from domestic manufacturers, for five years from FY 2028-29, capped at 50% of eligible capex — on top of 30% capital support. That is the production-linked incentive we model in full. A separate deployment-linked incentive for chip design (9% of net sales) and the capex-based Electronics Component Manufacturing Scheme sit alongside it; they are related but are not the same mechanism.
- How many sectors does the PLI scheme cover?
- Fourteen, per the Press Information Bureau: mobile manufacturing and electronic components, electronic products, IT hardware, telecom, white goods, automobiles and auto components, pharmaceuticals, bulk drugs, medical devices, specialty steel, textiles, food products, high-efficiency solar PV modules, advanced-chemistry-cell (ACC) batteries and drones. Our data and calculator model the electronics and semiconductor pillars, which are the ones relevant to Assam’s Jagiroad cluster; we do not model figures for the other sectors.
- How do I apply for a PLI, and when can I claim?
- You apply to the administering ministry or its project-management agency, not to a single PLI window — each sector has its own notification, eligibility bar and portal. For the semiconductor pillars, the India Semiconductor Mission (ISM) appraises applications. A production-linked incentive is claimed only after you are producing and can document the qualifying output — for the equipment PLI, that means invoice-level evidence that components were sourced from Indian manufacturers. Spending before your application is acknowledged is generally not counted.
Go Deeper
Policy Explorer
The semiconductor PLI, the design DLI, ECMS and every other central and Assam scheme, with the full source citation on each figure. Filter by your stage and sector.
Subsidy Calculator
Enter capex, entity type and location to estimate the central + Assam support a project can stack — capex grant and production incentive together.
India Semiconductor Mission
The scheme the semiconductor PLI sits inside — the five Semicon 2.0 pillars, who qualifies, and how a state top-up stacks.
See what your project can actually claim
Two ways in: run the numbers yourself, or have us pressure-test the full central-plus-state stack with you.
How this was built. The semiconductor PLI figures on this page are read from the Semicon 2.0 guidelines, via the same curated dataset that powers our Policy Explorer, so the explainer and the finder can never drift. The national-umbrella context (14 sectors, ~Rs 1.9 lakh crore) is attributed to the Press Information Bureau and Invest India; we do not model sector-by-sector figures beyond electronics and semiconductors. Everything here is our reading of published policy, for orientation only — not legal, tax or eligibility advice, and not a determination that any project qualifies. Confirm any figure with the administering ministry before you rely on it.